CAPITAL CAMPAIGN
2000 Progress Photo Album

2000 Progress Photo Album || 2001 Progress Photo Album

WINDOWS

wood trim
Wood trim was changed from grey to brown.

Single pane windows in breezeway, church school connector and south wall of school were replaced by double pane glass. Rotting exterior trim was replaced with mahogany and interior sills with oak.

Stained glass window scaffolding

DRAINAGE PROBLEMS

drainage system drain pipes
Rains on adjacent roofs frequently flooded into basement offices. New gutters and pipes now take roof water to underground drainage systems on the east side of the church.

OFFICE AREA

new corridor cabinets
To create an office corridor, a doorway needed to be cut in a load-bearing wall. Three new offices were created! The new office area and moving of other offices is nearly finished.

MASONRY

loose grout
bluestone entryway
Before - loose stones, missing grout, mildew and moss.

HEATING SYSTEM

boiler parts
old boiler
One of the largest projects was updating the heating plant. Two huge old boilers and all asbestos were removed in early June of 2000. Below is a picture of the new heating system! new boiler

ROOF WORK

Roof scaffolding
roof repairs
Staging was created to facilitate reshingling of towers and painting. New copper valleys between roofs were installed. Detailing and finishing of roof lines was part of the project.

Also visit the Capital Campaign 2001 Progress Photo Album